Use cases · ROI calculator

How much does your current scheduling cost you?

Our advisors estimate what a dynamic scheduling project would gain your shop floor, from your own data.

  • Assumptions drawn from real deployments
  • No commitment

Under construction

This tool is under construction.

Contact our advisors for their analysis: together you estimate the rescheduling hours saved, the TAT reduction and the WIP released, on your own figures.

Contact an advisor

They run their operations with ROBIN

MRO · Aerospace · Manufacturing

What makes these figures credible

Assumptions drawn from real shop floors, not from a theoretical model

  • 7 %

    less TAT

    Reduction observed on projects managed with ROBIN, without speeding up a single operation.

  • 30 min

    recovered per day and per operator

    Idle time eliminated, back-and-forth and organisational errors avoided.

  • 17 h

    recovered on a 10-day project

    The gain comes from the reaction delay removed, not from a higher pace.

  • Demonstration on your data within a few days
  • No limit on users, no per-seat licence
  • ERP, MES and CMMS connectors with no re-entry
  • Configurable by the business, not by IT
Shop floor feedback
“Before, almost all rescheduled tasks were rescheduled by hand, and a disruption took several hours to be detected and passed on.”

MRO player — landing gear equipment

Method

How the calculation is built

  • Operator productivity

    operators × minutes recovered / 60 × working days × hourly cost

  • Delays avoided

    projects × delay rate × assumed reduction × average penalty

  • Rescheduling time

    hours / week × 46 weeks × hourly cost × 70 % automated

  • Capacity freed up

    chantiers × TAT × réduction retenue = jours de capacité rendus

Your systems stay in place

ROBIN plugs into your existing ERP, MES and CMMS. No re-entry, no system replacement.

SAPOracleMicrosoft DynamicsInforSiemens OpcenterSageAPI / files
ROBIN.DataFlow — data integration & workflows

Your data remains yours

  • Hosting in the European Union, GDPR compliance
  • API-first: your data remains exportable at any time
  • Full operation traceability, a requirement of aerospace MRO
  • Contractual reversibility at the end of the contract

From diagnosis to first gain

  1. 01
    Operational diagnosis

    Mapping of flows, bottlenecks and performance losses.

  2. 02
    Demonstration on your data

    A few days, with no installation or system access.

  3. 03
    Quantified business case

    This estimate tested against your project history.

Take action

Have your gain estimated on your real data.

A scheduling engineer goes through your parameters with you and tests them against your project history.