01Manual or outdated scheduling
01Manual or outdated scheduling
- Reliance on Excel or paper → impossible to update in real time.
- Heavy dependence on the expertise of a single person.
- No ERP/MES integration → double data entry.
02Lack of real-time visibility
02Lack of real-time visibility
- Data scattered across tools and people.
- No live work order (WO) tracking.
- Information comes back too late, with no insight into bottlenecks.
03Frequent disruptions poorly managed
03Frequent disruptions poorly managed
- Unanticipated breakdowns.
- Absences not taken into account.
- Line stoppages caused by quality defects.
- Material / stock shortages discovered too late.
04Chaotic rescheduling
04Chaotic rescheduling
- Changing priorities with no logic everyone can follow.
- No way to simulate a change (what-if).
- Decisions made in a rush → drift.
05Underused resources
05Underused resources
- Workloads poorly balanced across lines, machines, operators and teams.
- Changeover / cleaning / calibration times ignored.
- Skills poorly allocated.
06Technical constraints poorly modelled
06Technical constraints poorly modelled
- Specific needs of certain machines (heating, long cycles).
- Product incompatibilities ignored (production sequence).
- Quality control constraints not taken into account.
07Weak cross-department coordination
07Weak cross-department coordination
- Unrealistic production planning.
- Maintenance & logistics out of alignment.
- Urgent requests imposed by sales with no real feasibility.
08No performance tracking
08No performance tracking
- KPIs missing or misused (adherence, OTD, OEE…).
- No improvement loop on routing times.
- No correlation between delays and their root causes.
09Rigid plan, not flexible enough
09Rigid plan, not flexible enough
- Plan too fixed, unable to adapt to the day's priorities.
- No dynamic week / day scenarios.
- Short-term vision only.
10Planner mental overload
10Planner mental overload
- The planner = bottleneck.
- Constant pressure.
- No time for analysis, no preventive action possible.