Ten Friction Points Handled by ROBIN

  • 01

    Manual or outdated scheduling

    01

    Manual or outdated scheduling

    • Reliance on Excel or paper → impossible to update in real time.
    • Heavy dependence on the expertise of a single person.
    • No ERP/MES integration → double data entry.
  • 02

    Lack of real-time visibility

    02

    Lack of real-time visibility

    • Data scattered across tools and people.
    • No live work order (WO) tracking.
    • Information comes back too late, with no insight into bottlenecks.
  • 03

    Frequent disruptions poorly managed

    03

    Frequent disruptions poorly managed

    • Unanticipated breakdowns.
    • Absences not taken into account.
    • Line stoppages caused by quality defects.
    • Material / stock shortages discovered too late.
  • 04

    Chaotic rescheduling

    04

    Chaotic rescheduling

    • Changing priorities with no logic everyone can follow.
    • No way to simulate a change (what-if).
    • Decisions made in a rush → drift.
  • 05

    Underused resources

    05

    Underused resources

    • Workloads poorly balanced across lines, machines, operators and teams.
    • Changeover / cleaning / calibration times ignored.
    • Skills poorly allocated.
  • 06

    Technical constraints poorly modelled

    06

    Technical constraints poorly modelled

    • Specific needs of certain machines (heating, long cycles).
    • Product incompatibilities ignored (production sequence).
    • Quality control constraints not taken into account.
  • 07

    Weak cross-department coordination

    07

    Weak cross-department coordination

    • Unrealistic production planning.
    • Maintenance & logistics out of alignment.
    • Urgent requests imposed by sales with no real feasibility.
  • 08

    No performance tracking

    08

    No performance tracking

    • KPIs missing or misused (adherence, OTD, OEE…).
    • No improvement loop on routing times.
    • No correlation between delays and their root causes.
  • 09

    Rigid plan, not flexible enough

    09

    Rigid plan, not flexible enough

    • Plan too fixed, unable to adapt to the day's priorities.
    • No dynamic week / day scenarios.
    • Short-term vision only.
  • 10

    Planner mental overload

    10

    Planner mental overload

    • The planner = bottleneck.
    • Constant pressure.
    • No time for analysis, no preventive action possible.